Latest Road Work and Closures in Montco Region - October 18

I-95 South ramp to Bridge Street
FULL RAMP CLOSURE from May 7, 2019 – Indefinitely, due to Water Main Break. Detour Posted.

U.S. 1 N & S (City Avenue)
LANE CLOSURE between Route 23 (Conshohocken State Road) and Monument Road. Weeknights from August 12 – December 31 from 7 PM - 3:30 AM, due to Utility Work.

I-95 N Girard Point Bridge
LEFT LANE CLOSURE between Exit 13 and Exit 17 from October 3 – October 20 from 8 AM -3 PM, due to Bridge Inspection.

Schuylkill Expressway I-76 E
FULL CLOSURE between 30th Street and South Street. From October 11 – October 21 from 11 PM -5 AM due to Removal of Existing Bridge Overlay/ PPC Placement.

U.S. 1

LEFT/RIGHT LANES AND SHOULDER CLOSURES between Delaware County Line to Bucks County Line from October 13 – October 26 from 9 PM – 5 AM, due to guard rail repair.

Schuylkill Expressway I-76 E
FULL Closure between Walnut Street on ramp to SR76 Eastbound from October 18 – October 21 due to Removal of Existing Bridge Overlay/PPC Placement.

Old Skippack Road; Lower Salford Township
PERMANENT SOUTHBOUND CLOSURE for 250 feet from Salfordville Road intersection. Drivers will be permanently directed around from April 24 - Indefinitely, due to Concrete Island Construction.

Route 63 (Sumneytown Pike); Upper Salford Township
Lane Closure and Temporary signal between Long Mill Road to Shady Lane, Thompson Road to Gerryville Pike, and Moyer Road to Bergey Road from May 28 - December 31, due to Bridge replacement. DETOUR POSTED.

Morwood Road; Franconia Township
LANE CLOSURE between Creamery Road and Hunsecker Road. Weekdays from July 22 - October 22 from 9 AM - 3 PM, due to Sewer Work.

Morwood/Creamery Road; Franconia Township                                                              
LANE CLOSURE between Fell Road and Landes Road. Weekdays from July 22 – October 22 from 9 AM - 3 PM, due to sewer work. 

Egypt Road; Upper Providence Township
FLAGGING between Eden Boulevard and MacDade Road. Weekdays from August 26 - October 31 from 9 AM - 3:30 PM, due to Utility Work.

Route 320 (Trinity Road); Upper Merion Township
CLOSURE AND DETOUR between Balligomingo Road and Holstein Road from August 29 - October 31 from 9 AM - 3 PM, due to Utility Work.

Roberts Road, Lower Merion Township
FULL CLOSURE between Lancaster Avenue and Montgomery Avenue from September 3 - November 1 from 9 AM - 3 PM, due to utility work. DETOUR POSTED.  

Hanover Street Bridge; Pottstown, North Coventry Townships
LANE CLOSURES between Industrial Highway and River Road from September 3 - October 30 from 7 PM - 6 AM, due to patching.

Route 422 (Benjamin Franklin Highway), Lower Pottsgrove Township
SINGLE LANE CLOSURES (Left and Right) between Armand Hammer Road and Airport Road from September 16 - November 1, due to road work. Eastbound 10 AM – 4 PM, Westbound 9 AM - 3 PM.

Davisville Road, Upper Moreland Township
LANE SHIFTS between Terwood Road and Byberry Road from September 19 – October 31 from 7 AM – 3 PM, due to Road work.

U.S. 422 (Benjamin Franklin Highway)

SHOULDER/ SINGLE LANE CLOSURE between S. Trooper Road and S. Hanover Street from September 23 – November 1 from 10 AM – 4 PM Eastbound and 9 AM – 3 PM Westbound, due to geotechnical testing.

Main Street, East Greenville Township

ONE LANE RESTRICTION between E.4th Street and E.5th Street from September 27 – October 23 from 9 AM – 3 PM, due to road work.

Pottstown Avenue, Pennsburg Borough
ONE LANE RESTRICTION between Seminary Street and Washington Street from September 30 – October 25 from 8 PM – 6 AM, due to utility construction.

Limekiln Pike, Upper Dublin Township
LANE CLOSURE between Jeffery & Martin Street from September 30 – December 13 from 9 AM – 3 PM, due to gas service replacement.

Butler Pike, Upper Dublin Township
LANE CLOSURE between E. 11th Street and Cardinal Drive from September 30 – December 13 from 9 AM – 3 PM, due to gas service replacement.

S. Bethlehem Pike, Montgomery Township
LANE SHIFTS between Lindenwold Terrace and Highland Avenue from October 2 – November 6 from 9 AM – 3 PM, due to underground utility installation.

Pleasant View Road, Lower Pottsgrove Township
SINGLE LANE CLOSURE between Donna Lane and Gross Road from October 3 – October 25 from 9 AM – 3 PM, due to road widening.

Croton Road, Upper Merion Township
LANE RESTRICTION/FLAGGING OPERATION between Fletcher Road and Kathwood Lane from October 4 – November 30 from 9 AM – 3 PM, due to water main replacement.

N. Lewis Road, Limerick Township
LANE CLOSURES between Linfield Trappe Road and Main Street from October 14 – October 19 due 9 AM - 11 PM.

U.S. 422, Limerick Township

LEFT LANE AND SHOULDER CLOSURE between Airport Road and Township Line Road from October 18 – October 21 from 10 AM – 5 AM, due to bridge reconstruction.

Virginia Drive, Upper Dublin Township

LANE CLOSURE between Susquehanna Drive and Office Center Drive from October 21 - November 15 from 9 AM – 3:30 PM, due to excavation.

Ashmead Road; Cheltenham Township
CLOSED & DETOURED between Tookany Creek Parkway and Newtown Avenue. 24-HOUR DETOUR from January 7 - November 15, due to bridge reconstruction. DETOUR POSTED.

Balligomingo Road; West Conshohocken Borough
CLOSED & DETOURED between Route 23 (Front Street) and Portland Road from June 27 - May 2020, due to slope stabilization. 24-HOUR DETOUR. DETOUR POSTED.

County Line Road; Upper Merion Township
CLOSED & DETOURED between Route 23 and Gulph Road from May 9 - December 29 from 7 AM Mondays - 5 PM Fridays, due to Road Work. DETOUR POSTED.

Hanover Square Road Bridge; New Hanover Township
BRIDGE CLOSURE following inspection from September 6 - Indefinitely. DETOUR POSTED.